Nils E. Tellier, P.E.: Over fifteen years of applied
design and field engineering experience.
Highlight of accomplishments:
-
Managed the construction and
start-up of over 20 air separation plants in the USA,
Canada, South Korea, Singapore, Indonesia, Argentina and
Chile.
-
Commissioned the first LNG
plant in Latin America (Argentina, 1995).
-
Designed liquid oxygen and
nitrogen storage facility with back-up capability under
black-out (Built in Indonesia in 2002).
-
Designed and permitted
sub-cooled LN2 facility with re-liquefaction for aerospace
applications.
-
Chaired panel session on
cogeneration application for air separation plants (Int'l
Joint Power Generation Conference 2001, New Orleans)
-
Managed engineering for
non-cryogenic air separation systems (PSA's, VSA's,
Membranes) for leading industrial gas company.
-
Designed 12 MW combined-cycle
power plants based on GE-PGT10 gas turbine.
-
Designed bio-gas purification
processes with CO2 extraction for landfill and digester gas
recovery.
-
Authored US-Patent #5,496,388
-
Managed the development of a
database, software and web portal for water and power
management. (Central Valley of California, 2005)
|
Credentials:
-
Licensed Professional
Engineer in Arizona, Colorado, New-Mexico
-
Member of the ASME since 1988
-
Member of the Order of The
Engineer
-
Member of the International
Who's Who of Entrepreneurs
-
Member of the Cryogenic
Society of America
|
-
Fluent in
spoken, written and technical English, French and Spanish.
-
BSME from the University of Colorado at Boulder
and DEUG SSM (Science and Structure of Materials) from the
University of Caen, France.
-
Trained by Pratt&Whitney Canada on the PT-6 gas
turbine heavy maintenance (1993)
-
Trained for Clean-Room Protocols (Motorola, 1994).
|
| Here is what people say:
|
The initial operation
of the plant required a strong and knowledgeable
start-up engineer . . . very fortunate to have just
such a person on the job — Nils Tellier. Nils works
hard, works smart and has been the key man in getting
the […] plant on line. He has a lot of perseverance,
doesn’t lose sight of the overall plan and enjoys the
work and the challenge.
I . . . recognize
Nils Tellier’s outstanding work on this project, the
long hours he has spent, and the extra effort he put
forth to make the job a success.”
J.T. Slaughter, P.E.
Walnut Creek, Calif. |
|
Nils,
You really helped us out on this project with a
difficult client and a difficult supplier… You had the
skills and knowledge that we lacked in this area so the
customer trusted your opinion.
That, my friend, was work of the highest quality and
difficulty…
J.
Shepherd, P.E.
Vancouver, B.C. |
| Nils
The oxygen plant
achieved purity in the first shot. You are the biggest
asset to the company.
Asad
Ali
Karachi, Pakistan |
|
|